A finished modern home with a distinctive weathered concrete facade and Cor-Ten steel entry, verified for Title 24 compliance
Title 24 · HERS/ECC Field Verification

California Energy
Code Compliance

One point of contact from CF1R review to your final CHEERS package. Every test scheduled, verified, and delivered — you build, we handle the compliance.

20+
Years Combined Experience
1,000+
Projects Verified
On-Site
Professional, Accurate Results
RCN13904
CHEERS Certification No.
Trusted By
IJ Design & Build WJ Mercier Construction, Inc. H and H Builders DJ Residential & Commercial Insulation Scott Mumford Heating & Air AC911, an Alfa Services Company NPR Heating & Air Conditioning Corp Ron Briant Heating & Air Conditioning The Keystone Company York Construction Brooktree Development CRC Services Framing Square Construction Garnica Construction Landmark Enterprises Malibu Valley Mark Matheisen Construction McGregor Co. Navarro Construction Tri-Mec, Trifecta Mechanical Contractors

Start to Finish

Don't get surprised by Title 24 requirements — or surprised at the end of the job. Our proprietary software builds a workflow specific to your project straight from the CF1R, so your crew always knows what's needed, and when.

See the Workflow
Start
Front elevation drawing from the plans
to
New home under construction, scaffolding and sheathing
Finish
Finished new home, verified and complete
01
Office scheduling a project and reviewing the CF1R
Schedule
We build a workflow timeline listing every Title 24 and equipment requirement for your project. The earlier you schedule, the smoother it runs. We coordinate with your subs, GC and energy consultant. If your CF1R needs a revision, we can coordinate that too.
02
Rater measuring airflow with a flow hood
Testing & Inspections
Accurate, professional on-site testing and inspections: air sealing, insulation, HVAC and blower door testing.
03
CHEERS Project Status Report showing all items complete
Registration
We handle your compliance forms — CF2R installation forms and CF3R verifications, registered in CHEERS — to produce your Project Status Report, ready for your inspector. Nothing left for you to chase.
Proprietary Field Verification Software
Rater using the field verification app on a custom clipboard rig during a QII inspection Logged on site, in real time
Every test — duct leakage, refrigerant charge, airflow, insulation — runs through proprietary software built specifically for Title 24 field verification. No other rater has it. Every result is geo-located and time-stamped automatically, the moment it's recorded. Equipment model plates are scanned directly for accuracy, not hand-typed.
Decode Your CF1R
Interactive CF1R guide: click any item on the CF1R for an explanation Interactive CF1R
Not sure what something on your CF1R means? Find any feature that appears on your CF1R in our interactive guide and click it for a full explanation — what it is, the code section behind it, and how it gets verified. Insulation, HVAC equipment, ductwork, ventilation, water heating and more.
Open the Interactive CF1R Guide

What Gets Verified

Every test documented, every result defensible — built for the inspection, not just the paperwork.

Spray foam insulation at the roof deck
Building Envelope
Quality insulation installation and cool roof, verified on site against what the CF1R requires.
CF2R-ENV-01 / 03 / 04 / 21 / 22
Rater logging field data at a VRV outdoor unit
HVAC
Duct leakage, airflow, fan efficacy, refrigerant charge, and heat pump heating capacity — measured and witnessed on site.
CF2R-MCH-20 / 22 / 23 / 25
Energy recovery ventilator with the core exposed
Indoor Air Quality
Whole-dwelling mechanical ventilation and kitchen range hood verification, checked against required CFM.
CF2R-MCH-27 / 32
Heat pump water heater installation
Water Heating
Water heater installation verification — model, UEF rating, and installation matched against what the CF1R specifies.
CF2R-PLB-02
Page 1 of a CF1R certificate of compliance
CF1R Plan Review
We catch mismatches between what was modeled and what's on the plans before they become a field failure.
CF1R-PRF-01
Sample page from the compliance report
Compliance Documentation
Every result compiled into your CHEERS-ready package, plus the itemized homeowner report Title 24 now requires. Additional CF2R data entry — fenestration, PV, electric-ready, insulation, and more, as needed — handled at project close-out, whether HERS/ECC witnessed or not.
CF3R · Homeowner Report

We Handle the Confusing Part.

We understand Title 24 can be confusing, burdensome, even unnecessary-feeling. You shouldn't have to become an expert in it just to build to code.

Project Status Report
CHEERS generates a Project Status Report for every registered project — it's the document your on-site inspector actually checks. Once your installer signs off on the CF2R, we make sure it's in hand before the inspection, not after.
CHEERS, Handled
The state's compliance registry isn't built for a contractor to navigate on the side. We handle the CHEERS side of every project so you don't have to learn it.
One Path, Not Two
The exact same installed equipment can pass under a performance energy model and fail under a prescriptive one. We catch that mismatch before it becomes a field failure.