CF1R: What Is It?
Three Things Your Architect Wonāt Tell You Before You Build an ADU
Kitchen Range Hoods and Title 24: Why So Many Fail, and How to Pick One That Passes
Range hoods are one of the most common items to fail at final. The hood has to be HVI or AHAM listed, meet the airflow for your homeās floor area and cooktop fuel, and be quiet enough. Hereās what to check before you buy.
Refrigerant Charge Verification: Why Your Rater Has to Be There Before the System Is Charged
As of January 1, 2026, every heat pump in California requires refrigerant charge verification. For mini-splits and most inverter heat pumps, that means a witnessed weigh-in at install. Call your HERS/ECC Rater after the system is charged, and the entire system has to be recovered and recharged from zero.
Title 24 2025 California: What Contractors Need to Know
Owner/Builder ADU Guide: Title 24 2025 Energy Compliance in California