ADU HERS/ECC Testing
Title 24 applies to every ADU, and the HERS/ECC verifications on your CF1R have to be completed and registered before final. Consult with an ECC Rater early. Even with a great contractor, Title 24 verification is its own specialty, and timing matters.
Detached, attached, a garage conversion or a junior ADU. Whether you’re an owner-builder or a contractor with several in the pipeline, we lay out exactly what gets verified, when it has to happen, and what has to be ready at each visit.
At a glance
Your CF1R lists what has to be verified on your ADU.
The CF1R is the Title 24 energy report for your ADU. Your energy consultant runs the energy model and the CF1R comes out of it. It’s part of your plan set, and it spells out what gets verified and the efficiency levels the construction assemblies need to meet.
The CF1R lists the requirements for your project to comply. These are the minimum requirements the project must meet, but you can always exceed those requirements.
The language on the CF1R is ambiguous and difficult to interpret. That’s why I built this interactive CF1R. Pull out your CF1R, find the requirements listed on it, and click the matching items on the CF1R below. Each one tells you what it means, the code section behind it, and how I verify it. On a phone, turn it sideways.
More on the CF1R: CF1R: What Is It?
Click any item on the form for an explanation: what it is, the code section, and how it gets verified.
| 01 | 02 | 03 | 04 | 05 | 06 |
|---|---|---|---|---|---|
| Control | Capacity (kWh) | Charging Efficiency | Rate (kW)Rate (kW) | Discharging Efficiency | Rate (kW)Rate (kW) |
| Basic | 10 | 0.95 | n/a | 0.95 | n/a |
Building-level Verifications:
• Maximum fan efficacy: ≤ 0.35 W/CFM
• Maximum sound rating: ≤ 1.0 sone
• Rated for continuous 24-hour operation
• Manual switch required — labeled as whole-house ventilation fan
• Must be ducted to outdoors Code section§150.0(o) RA3.7.3 RA3.7.4 Verified byHERS/ECC Rater measures exhaust CFM — must meet or exceed CF1R required ventilation rate. CF2R-IAQ-xx-H.
• Fan efficacy: ≤ 0.6 W/CFM
• SRE and ASRE must meet or exceed CF1R minimums
• Rated for continuous 24-hour operation
• Fault Indicator Display (FID) required if specified on CF1R Code section§150.0(o)1 RA3.7.3 RA3.7.4.4 Verified byHERS/ECC Rater measures supply and exhaust CFM, confirms balance %, verifies SRE/ASRE and fan efficacy. CF2R-IAQ-xx-H.
• HVI: hvi.org/hvi-certified-products-directory/
• AHAM: aham.org CFM requiredMinimum airflow per Table 150.0-G by CFA and fuel type. HVI/AHAM rated CFM only.
| CFA (sq ft) | Electric Range Min CFM | Gas Range Min CFM |
|---|---|---|
| < 750 | 160 | 280 |
| 750 – 1,000 | 130 | 280 |
| > 1,000 – 1,500 | 110 | 250 |
| > 1,500 | 110 | 180 |
• Hood not in HVI or AHAM directory
• HVI/AHAM rated CFM below required minimum
• Sone rating exceeds 3.0 at working speed
• Lowest fan speed below 100 CFM Code section§150.0(o)1G Table 150.0-G RA3.7.4.3 Verified byHERS/ECC Rater photographs model number, looks up HVI or AHAM directory, confirms rated CFM and sone rating. CF2R-IAQ-xx-H.
Cooling System Verifications:
| Project Type | System Type | Min Airflow |
|---|---|---|
| New Construction | Standard ducted | 350 CFM/ton |
| New Construction | Small duct high-velocity | 250 CFM/ton |
| Alteration | Standard ducted | 300 CFM/ton |
| Alteration | Small duct high-velocity | 250 CFM/ton |
• Previously sealed duct systems registered with a HERS/ECC provider
• Systems unable to meet 300 CFM/ton — alternative procedure RA3.3.3.1.5 with thermostat per §110.12
• Asbestos duct systems Code section§150.0(m)13 §150.2(b)1F RA3.3 Verified byHERS/ECC Rater measures system airflow. CF2R-MCH-23-H.
The HERS/ECC Rater must be physically present. Calling after the install is one of the most common compliance failures. Remote or after-the-fact verification is not permitted.
• Factory charge (lbs and oz) — from equipment nameplate
• Factory line set length (ft) — length the factory charge is designed for
• Actual installed line set length (ft) — must be measured, not estimated
• Liquid line diameter — from equipment specs or nameplate
• Charge correction rate (oz/ft) — from manufacturer's installation manual
Heating System Verifications:
If the outdoor condenser and indoor air handler are not a tested and certified combination, they will not appear in the AHRI directory and cannot be verified. This is a compliance failure that will result in the replacement of the system with a compliant system.
2. Confirm AHRI certified capacity at 47°F ≥ CF1R required
3. Confirm AHRI certified capacity at 17°F ≥ CF1R required
4. If not listed → system must be replaced Common failureContractor installs Brand A outdoor unit with Brand B indoor air handler. Even if both are high quality, the combination is not tested together, will not appear in AHRI, and must be replaced with a compliant matched system. Code sectionRA3.4.3.2 §150.1(c)14 Verified byHERS/ECC Rater confirms AHRI certified capacity for the matched system at 47°F and 17°F vs CF1R required BTU/hr. CF2R-MCH-23-H.
HVAC Distribution System Verifications:
Domestic Hot Water System Verifications:
What kind of ADU?
The type of ADU sets the compliance path. Line 12, “Project Scope,” on your CF1R shows which one was used.
Detached ADU
A new, separate building. It complies as a newly constructed dwelling, so it typically carries the full set of verifications — envelope, HVAC, ventilation and water heating.
Attached ADU or garage conversion
Building onto the house, or turning an unconditioned garage into living space, adds conditioned floor area — so it complies as an addition (§150.2(a)). What gets verified depends on the compliance path and the systems serving the new space.
Junior ADU
A JADU inside the existing house adds no conditioned floor area, so it complies as an alteration (§150.2(b)). Verification applies to the systems being altered — for example, a new or replaced HVAC system or water heater.
What gets verified
Your CF1R lists which of these apply. Each link explains the test, the code section and what it takes to pass.
What holds up a final
The most common first. Every one of these is easy to avoid when it’s planned for.
Mini-split charged without a witnessed weigh-in
Most ADUs use a ductless mini-split. When the CF1R requires refrigerant charge verification, I have to witness the weigh-in when the system is charged: vacuum, decay test and a digital-scale weigh-in. Schedule me before the system is charged. If the weigh-in is missed, the refrigerant has to be recovered and weighed back in.
Kitchen range hood
The hood has to be listed in the HVI or AHAM directory, vent to the outdoors, and be rated at 3.0 sones or less at 100 CFM or more. It also needs enough rated airflow at working or high speed, and the smaller the floor area, the more airflow it needs. That hits ADUs hardest. Check the exact model before you buy.
| ADU floor area | Electric / induction | Gas |
|---|---|---|
| Under 750 ft² | 160 CFM | 280 CFM |
| 750–1,000 ft² | 130 CFM | 280 CFM |
| Over 1,000–1,500 ft² | 110 CFM | 250 CFM |
Insulation or ducts covered before verification
QII and duct rough-in have to be verified before insulation and drywall cover the work. Call me when framing starts.
Equipment that doesn’t match the CF1R
The HVAC system, water heater and windows that get installed have to meet what the CF1R lists. Check before you order. A substitution can mean a CF1R revision before final.
Installer certificates in CHEERS
The installers register their certificates (CF2Rs) in CHEERS before I can complete mine. Ask your HVAC and insulation installers up front whether they have a CHEERS account.
Owner-builders and contractors
Same verifications either way. Here’s what we handle for each.
- Send us your CF1R and we map out every verification and when it’s due.
- We provide an itemized estimate. Most jobs do not require a retainer.
- Before each visit, you know exactly what has to be ready — so nothing has to be opened back up.
- We walk you through the CHEERS registration steps.
- You get the CHEERS Project Status Report before your final inspection — the document the inspector looks for.
Read: Owner/Builder ADU Guide · Three Things Your Architect Won’t Tell You Before You Build an ADU
- One ECC Rater for every ADU you build, scheduled around your trades.
- Rough-in, install and final visits planned from the CF1R.
- CF1R plan review — catch mismatches between the CF1R and the plans before you build.
- The Project Status Report in hand before the inspector arrives.
Get your ADU’s workflow
Upload your CF1R and see every verification for your project, at the stage it happens.
Upload your CF1R and get a step-by-step workflow built from it — what gets verified, at which stage, and what has to be ready.
Get Your WorkflowChoosing a range hood, bath fan or ERV/HRV? Check the model against the HVI and AHAM listings before you buy.
Check Your Equipmenteccraters.com/adu
Building an ADU?
Send us your CF1R and we’ll lay out every verification and when it has to happen.